Warning: mkdir(): Permission denied in /home/virtual/lib/view_data.php on line 81

Warning: fopen(upload/ip_log/ip_log_2024-06.txt): failed to open stream: No such file or directory in /home/virtual/lib/view_data.php on line 83

Warning: fwrite() expects parameter 1 to be resource, boolean given in /home/virtual/lib/view_data.php on line 84
Reconstruction of failed fixed implant prosthesis accompanied by abutment screw loosening and fracture : A case report

J Korean Dent Assoc > Volume 55(7); 2017 > Article
The Journal of The Korean Dental Association 2017;55(7):457-466.
Published online July 31, 2017.
나사풀림과 나사파절이 동반된 실패한 임플란트 고정성 보철물의 회복증례
배은빈1, 신영근2, 전영찬3, 정창모4, 윤미정5, 이소현6, 허중보7
1부산대학교 치의학전문대학원 치과보철학교실
2부산대학교 치의학전문대학원 치과보철학교실
3부산대학교 치의학전문대학원 치과보철학교실
4부산대학교 치의학전문대학원 치과보철학교실
5부산대학교 치의학전문대학원 치과보철학교실
6부산대학교 치의학전문대학원 치과보철학교실
7부산대학교 치의학전문대학원 치과보철학교실
Reconstruction of failed fixed implant prosthesis accompanied by abutment screw loosening and fracture : A case report
Eun-Bin Bae1, Young-Gun Shin2, Young-Chan Jeon3, Chang-Mo Jeong4, Mi-Jung Yun5, So-Hyoun Lee6, Jung-Bo Huh7
1Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
2Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
3Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
4Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
5Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
6Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
7Department of Prosthodontics, Dental Research Institute, Institute of Translational Dental Sciences, BK21 PLUS Project. School of Dentistry, Pusan National University
Abstract
In the case of failed fixed implant prosthesis accompanied by abutment screw fracture, fractured screw fragment must be removed to use the existing implant fixtures. A 61-year-old male patient, who had a failed maxillary fixed implant prosthesis accompanied by three abutment screw fracture, hoped to reconstruct the maxillary implant prosthesis, while maintaining the existing implant fixtures. To use the existing implant fixtures, fractured screw fragments were removed. A maxillary implant overdenture using available existing implants was planned. Bar-attachment with Locator was used for implant splinting, denture stability, and retention. Final impression was taken after treatment of peri-implantitis. Jaw relation registration was taken to evaluate available interarch space for bar-attachment. After fabricating bar-attachment, centric relation was taken. Implant overdenture using bar-attachment with Locator was delivered after wax-denture evaluation. This case report showed that a satisfactory clinical result was achieved by implant overdenture using existing implant fixtures in a maxillary edentulous patient.
Key Words: edentulous maxilla;screw loosening;screw fracture;implant overdenture;
TOOLS
METRICS Graph View
  • 2 View
  • 0 Download
Related articles


Editorial Office
Korean Dental Association, 257 Gwangnaru-ro, Seongdong-gu, Seoul 04802, Korea
Tel: +82-2-2024-9100   Fax: +82-2-468-4655/58   

Copyright © 2024 by Korean Dental Association.

Developed in M2PI